3 Projects Completed
3 Projects Ongoing
6 Services Offered
5 Vehicles for Hire

Why Choose Us

What clients tell us makes the difference on their projects.

In-House Engineering

Our own engineers prepare the drawings and supervise the works, so design intent survives all the way to site.

We Own Our Equipment

Tippers, bowsers and site vehicles are ours, which keeps programme control with us rather than a hire queue.

Finished to Specification

Materials are tested at each stage and every scheme is handed over with as-built drawings and an operations manual.

Working Countrywide

We deliver in every province, including districts where access roads make logistics the hardest part of the job.

What We Do

Civil works delivered across Rwanda, from water supply to roads and buildings.

Water Supply Systems

Design and construction of gravity and pumped water schemes, reservoirs and distribution networks.

Road Construction

Feeder roads, access roads and urban streets, including earthworks, base layers and surfacing.

Building Construction

Institutional, commercial and residential buildings from foundation to finishing.

Engineering Design & Drawings

Structural, civil and water engineering drawings prepared for permit approval and construction.

Drainage Works

Storm water drains, culverts and erosion control for roads, settlements and farmland.

Construction Equipment Hire

Tipper trucks, pickups and site vehicles available with or without a driver.

Our Work

A selection of the projects we have delivered and those under way.

Nyamata Water Supply Extension
Water Construction Completed

Nyamata Water Supply Extension

Extension of the Nyamata water network to serve four additional cells, including a 250 m3 reservoir.

Bugesera

Rwamagana Storm Water Drainage
Drainage Ongoing

Rwamagana Storm Water Drainage

Lined storm water channels and culverts addressing seasonal flooding in Rwamagana town centre.

Rwamagana

34% complete

Equipment & Vehicle Hire

Available by the day, with or without a driver.

Latest News

Common Questions

How long does a building permit application take?

Processing normally takes 15 to 30 working days from the date a complete application is received. Incomplete document sets are the most common cause of delay, so check the required documents list before submitting.

You will need proof of land ownership, a national identity document, architectural and structural drawings, and a site plan. All documents are uploaded as part of the online application.

Yes. We deliver projects across all provinces of Rwanda and have completed works in Bugesera, Musanze, Gicumbi, Huye and Rwamagana among others.

Yes. Vehicles can be hired with or without a driver. Self-drive hire requires a valid driving licence and a refundable deposit; the driver fee shown on each vehicle applies only if you choose to include one.

Internships include a monthly transport and lunch allowance. The exact amount is stated on each position listing, as it varies by placement length and location.

Planning a project?

Talk to our team about construction works, engineering drawings or a building permit.

Apply for a Permit Email Us